By Debi Derby
A letter to residents of Kiowa County School District RE-1,
I would like to address some things I have heard regarding the Eads Schools bond issue. A common thing being said around the community is that we don’t need a new school, we just need to repair what we already have. Most of those people making such comments have not been to community meetings at the school, therefore don’t have a clue what needs to be repaired, nor the cost of needed repairs.
I substitute teach at the high school (including Vo-Ag), middle school, elementary school, and preschool. Classrooms and the hallway in the high school have water stained ceiling tiles, with many of them loose. Water damage can be seen around the vent grates with ceiling tiles peeling. Vents make a LOT of noise when the wind blows. Electrical cords, lots of electrical cords, snake through the classrooms, some hanging from the ceilings, many crossing ceilings and the floor. When the wind blows there are electrical issues as conduit runs across the roof outside. There are cracks in the cinderblock walls. Carpet is old and stained. Cabinets are old and some don’t shut. There is very little storage in most rooms. The old home-economics room still has appliances that were there when the school was opened in 1963. Take a look at the restrooms when you go to a ballgame. These are the only restrooms available for our high school students to use, and they need updated. The girls’ bathroom has a stall that hasn’t been able to be used for quite some time. Locker room showers are in horrible shape. Desks and tables are old and need replaced in all buildings. The class bells don’t work in the elementary building so someone has to use a hand-held alarm in the hallway every day.
There are safety issues in all buildings. The State of Colorado does not like that we don’t have a vestibule in each building to prevent someone from entering our schools and having access to students. Some parents don’t like that our younger students have to walk outside to go to P.E. and the cafeteria, and cross a street to go to music. The high school kids have to leave the building to attend Vo-Ag and to eat breakfast and lunch. Morning drop-offs and afternoon-pickups at the elementary building are unsafe to say the least.
HVAC in the Elementary, Middle School, High School, Vo-Ag, and Cafeteria need to be addressed. The HVAC in the elementary/middle school is so loud when it comes on that I can’t hear students and they can’t hear me talk. Often the high school classrooms are either too hot or too cold and adjusting the thermostat doesn’t fix the problem. The system needs to be replaced due to new state regulations. There are plumbing issues in the Elementary Gym, the Elementary building, the High School (student restrooms as well as locker rooms), the Cafeteria, and Vo-Ag. The music room cannot be reached by someone with a mobility disability unless someone carries them up the stairs. Did you know the music room is now also used as a locker room? There are electrical issues in all buildings. There are interior issues in all buildings. The rock on the outside of the Middle School/Elementary/Preschool building is deteriorating quickly. The Vo-Ag building was already red-flagged last year as we don’t have a ventilation system as required by the State. How many years will the State allow us to teach out of that building without proper ventilation? There are other issues in that building as well. Vo-Ag will be moved to a classroom in the high school and classes would consist of only “book learning” (no welding, construction, shop class, etc.) if the State closes the Vo-Ag building. Then there is the roof issues at the high school. Water runs down the brick walls in the hallway. Take a look at the brick inside the hallway before you enter the gym. Note all of the stains on the walls caused by water. Look again down the hall between the boys and girls restrooms. Water was actively running down the wall when we were putting up Homecoming decorations a couple of weeks ago.
I could write more on issues at the school, but I think by now most people will understand the cost to fix all of the issues in the district would total several millions of dollars. The school doesn’t have the money needed to fix these issues. The school could try to get a loan to fix projects which would mean cutting programs and extracurricular activities for years and years if not forever. Or the school could apply for a Best Grant for $20 million dollars to fix all of the known problems. The portion Kiowa County residents would need to contribute for that $20 million grant would likely be the same $4.65 million dollars they would need to pay for a $60 million renovation and addition. Should we put a band aid on the problems we KNOW we have (and wait for the next issues to surface), or should we fix safety issues, the problems in the elementary/middle school, revamp the old gym into a new cafeteria, add needed room for Special Ed/BOCES, combine the school libraries into one area, make everything ADA compliant, put administration in one area instead of in different buildings, build a new high school addition with a new Vo-Ag, add a bus barn by the water town on the north end of town, and add parking lots and separate drop off areas for buses and parents?? The addition would connect the schools and everything would be under one roof!
Solar farms are coming to the county that will be in our school district. The assessed value of the county will go up once these solar farms are up and running. THAT means the amount the school district residents will pay for a Best Grant for a school or a renovation of the school will INCREASE. Instead of our portion of a project being $4.65 million, that amount could go up to $6 million or more. This election year is the best time to pass this bond issue for that very reason. If the Best Grant isn’t awarded to the school district this next year, the additional property tax will not be billed to us. If the Best Grant isn’t awarded for another 2 years, because we passed the bond this year, has up to this point never increased the portion needing to be paid because the bond was passed at a previous time. Do we want to wait and take the chance of needing to pay even more for the district’s portion of future repairs or renovations?
Most schools in our area have been updated. McClave was awarded a Best Grant and their new school will be completed in 2027. Granada was awarded a Best Grant this year and needs to pass a bond issue to go ahead with their project. Holyoke received a Best Grant in the amount of $52,351,924.54 to build a new elementary school. The town of Kiowa in Elbert County was awarded $72,884,710.00 for a Pre-K – K-12 new school. They tried to pass a bond for a few years for a new school and the bond was defeated each time. The cost of the school to be built now is higher than when they were first awarded the grant. Crowley County applied for a new CTE (Vo-ag) building in the amount of $6,677,033.72 (this gives one a good idea of how much a Vo-Ag building would cost to be replaced). They were not awarded a Best Grant this year, but two schools who were awarded the Best Grant need to pass bond issues, and Crowley County will receive the grant if those 2 school districts don’t pass their bond issues.
Things at the school won’t get better. Things as they are will only get worse. At some point, something will have to be done. The square footage of the current plan has been reduced from the original plan by 9000 square feet, but the square footage of the school will be approximately the same as it is now. We used to take pride in our school buildings as we had one of the nicest school campuses in the area. Not anymore. Also, be aware that from the time a Best Grant is awarded, it usually takes 3 years from that time for a school to be finished. How many more things will need to be repaired in that 3 year period?
Feel free to ask me any questions you may have regarding the school plan as I have attended every school/community meeting. Better yet, visit the schools. Look around. Ask administration what the issues are and what the estimated cost is to complete the repairs needed. Ask to see the drawings of the new addition. Just don’t talk to others in the community about how it would be cheaper to just fix what is wrong until you know just what those costs would be, AND figure out how those repairs would be paid for. Don’t say our student count is going down so we don’t need a new school. In the next few years our high school will actually have more students than are attending high school now if you look at the numbers of kids we have in elementary/middle school. Birth rates throughout the United States have dropped. Most schools student counts have dropped. Yes, some students are homeschooled. Do you remember how student scores declined during COVID when students had to attend school at home? A majority of parents do not want to homeschool their children.
Eads needs our schools to survive. How long would the hospital be able to stay open if their employees did not have a school for their children to attend? How many businesses would close? How many people would leave the county so their children would have a school to attend? Please think about the education you received and how things have changed since then. Think about advancements in technology and how quickly things are changing. Our kids deserve a good education and the best technology we can afford. Our school and our students need your support. Please show that support by voting YES on Bond Issue 4A!
Sincerely,
Debi Derby