The Cheyenne Planning and Zoning Board will conduct a public hearing on the application at 2:30 P.M. on October 29th, 2026, at the Cheyenne County Fairgrounds Meeting Room, 427 South 7th Street W, Cheyenne Wells, Colorado 80810. The application is available for public review, and you may obtain more information or provide comments by contacting: Jerry Allen, Land Use Administrator, 80 East 1st / PO Box 776, Cheyenne Wells, CO 80810, This email address is being protected from spambots. You need JavaScript enabled to view it.
The purpose of the hearing is to review the application for the utility scale Rosewood Solar Project, which is proposed to consist of a maximum of 300 Megawatts (MW) and a 300 MW battery energy storage system (BESS), and various appurtenant equipment. The Project would be located in Cheyenne County, Colorado, approximately ten miles northwest of Cheyenne Wells and approximately six miles west of U.S. Highway 385. The Project is situated within Townships 12 South and 13 South, Range 45, including portions of Sections 19, 30, 31, 32, 5, and 6.